DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:6 December 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:06/MBBI-MCDI/XII/2025
Dive No:06A/MBBI-MCDI/XII/2025
Task / Activity:Underwater airlift and cutting operations to facilitate the lifting process.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Syahrulloh
Standby Diver:Natas
Tender 1:Imam
Tender 2:Yakub
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.5 m
Current:Moderate
Water Temp:29 °C
Depth:23 ft
Dive Timing
Left Surface:08:54
Arrive Bottom:08:55
Left Bottom:10:51
Arrive Surface:10:52
Bottom Time:116 min
Total Time:118 min
Summary
Job Result:Diver has perform underwater airlift and connect slung wire to facilitate the lifting process
Supervisor Signature

Signed by: Ahmad Maulana