DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
5 December 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
05/MBBI-MCDI/XII/2025
Dive No:
05C/MBBI-MCDI/XII/2025
Task / Activity:
Underwater connect sling to lifting process.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Natas
Standby Diver:
Syahrulloh
Tender 1:
Imam
Tender 2:
Yakub
Environmental Conditions
Weather:
Cloudy
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Moderate
Water Temp:
30 °C
Depth:
23 ft
Dive Timing
Left Surface:
14:05
Arrive Bottom:
14:06
Left Bottom:
15:05
Arrive Surface:
15:06
Bottom Time:
59 min
Total Time:
61 min
Summary
Job Result:
The diver has connect wire sling to sheetpiles and the big one pieces metal debris has been lifted.
Signed by:
Ahmad Maulana