DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
28 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
28/MBBI-MCDI/XI/2025
Dive No:
28B/MBBI-MCDI/XI/2025
Task / Activity:
Continue cutting and connect material to make easier to be lifted.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Natas
Standby Diver:
Imam
Tender 1:
Yakub
Tender 2:
Environmental Conditions
Weather:
Cloudy
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Moderate to Strong
Water Temp:
29 °C
Depth:
23 ft
Dive Timing
Left Surface:
13:59
Arrive Bottom:
14:00
Left Bottom:
15:58
Arrive Surface:
15:59
Bottom Time:
118 min
Total Time:
120 min
Summary
Job Result:
Rhe divver succesfull Continue cutting and connect material to make easier to be lifted with 3 sheet piles and 1 waller has bewn lifted.
Signed by:
Ahmad Maulana