DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:28 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:28/MBBI-MCDI/XI/2025
Dive No:28B/MBBI-MCDI/XI/2025
Task / Activity:Continue cutting and connect material to make easier to be lifted.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Natas
Standby Diver:Imam
Tender 1:Yakub
Tender 2:
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.5 m
Current:Moderate to Strong
Water Temp:29 °C
Depth:23 ft
Dive Timing
Left Surface:13:59
Arrive Bottom:14:00
Left Bottom:15:58
Arrive Surface:15:59
Bottom Time:118 min
Total Time:120 min
Summary
Job Result:Rhe divver succesfull Continue cutting and connect material to make easier to be lifted with 3 sheet piles and 1 waller has bewn lifted.
Supervisor Signature

Signed by: Ahmad Maulana

Foto Dokumentasi