Company Logo

DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:24 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:24/MBBI-MCDI/XI/2025
Dive No:24B/MBBI-MCDI/XI/2025
Task / Activity:Continue the airlift operation on the seabed to facilitate the lifting of metal debris.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Imam
Standby Diver:Yakub
Tender 1:Natas
Tender 2:
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.5 m
Current:Moderate
Water Temp:30 °C
Depth:21 ft
Dive Timing
Left Surface:13:50
Arrive Bottom:13:51
Left Bottom:15:15
Arrive Surface:15:16
Bottom Time:84 min
Total Time:86 min
Summary
Job Result:Diving operations have been put on hold due to a malfunction in the airlift system. Diver left bottom and on deck.
Supervisor Signature

Signed by: Ahmad Maulana

Foto Dokumentasi