DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
23 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
23/MBBI-MCDI/XI/2025
Dive No:
23A/MBBI-MCDI/XI/2025
Task / Activity:
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Imam
Standby Diver:
Yakub
Tender 1:
Natas
Tender 2:
Environmental Conditions
Weather:
Clear
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Moderate
Water Temp:
30 °C
Depth:
23 ft
Dive Timing
Left Surface:
08:44
Arrive Bottom:
08:45
Left Bottom:
10:43
Arrive Surface:
10:44
Bottom Time:
118 min
Total Time:
120 min
Summary
Job Result:
Underwater cutting metal debris has been performed in progress but on hold due to temporary maintenance on the CCTV system.
Signed by:
Ahmad Maulana