Company Logo

DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:23 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:23/MBBI-MCDI/XI/2025
Dive No:23A/MBBI-MCDI/XI/2025
Task / Activity:
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Imam
Standby Diver:Yakub
Tender 1:Natas
Tender 2:
Environmental Conditions
Weather:Clear
Wind Speed:0-5 Knots
Wave Height:0.5 m
Current:Moderate
Water Temp:30 °C
Depth:23 ft
Dive Timing
Left Surface:08:44
Arrive Bottom:08:45
Left Bottom:10:43
Arrive Surface:10:44
Bottom Time:118 min
Total Time:120 min
Summary
Job Result:Underwater cutting metal debris has been performed in progress but on hold due to temporary maintenance on the CCTV system.
Supervisor Signature

Signed by: Ahmad Maulana

Foto Dokumentasi