DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
23 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
23/MBBI-MCDI/XI/2025
Dive No:
23B/MBBI-MCDI/XI/2025
Task / Activity:
Continue Underwater cutting metal debris.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Yakub
Standby Diver:
Natas
Tender 1:
Imam
Tender 2:
Environmental Conditions
Weather:
Cloudy
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Moderate
Water Temp:
29 °C
Depth:
23 ft
Dive Timing
Left Surface:
14:05
Arrive Bottom:
14:06
Left Bottom:
16:07
Arrive Surface:
16:08
Bottom Time:
121 min
Total Time:
123 min
Summary
Job Result:
The diver has finished cutting the sheet piles to be lifted.
Signed by:
Ahmad Maulana