DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
22 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
22/MBBI-MCDI/XI/2025
Dive No:
22A/MBBI-MCDI/XI/2025
Task / Activity:
Underwater seabed survey for mapping metal debris condition.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Yakub
Standby Diver:
Natas
Tender 1:
Imam
Tender 2:
Environmental Conditions
Weather:
Clear
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Calm
Water Temp:
30 °C
Depth:
23 ft
Dive Timing
Left Surface:
09:32
Arrive Bottom:
09:33
Left Bottom:
10:24
Arrive Surface:
10:25
Bottom Time:
51 min
Total Time:
53 min
Summary
Job Result:
The diver has completed the seabed survey from point 162 to point 210.
Signed by:
Ahmad Maulana