DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:21 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:21/MBBI-MCDI/XI/2025
Dive No:21C/MBBI-MCDI/XI/2025
Task / Activity:Continue Underwater inspection for make sure metal debris condition after cutting and still cannot be lifted.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Imam
Standby Diver:Yakub
Tender 1:Natas
Tender 2:
Environmental Conditions
Weather:Clear
Wind Speed:0-5 Knots
Wave Height:0.7 m
Current:Moderate
Water Temp:30 °C
Depth:20 ft
Dive Timing
Left Surface:13:43
Arrive Bottom:13:44
Left Bottom:15:40
Arrive Surface:15:41
Bottom Time:116 min
Total Time:118 min
Summary
Job Result:The diver successfully cut the metal debris and it has been lifted to the surface.
Supervisor Signature

Signed by: Ahmad Maulana