DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
21 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
21/MBBI-MCDI/XI/2025
Dive No:
21B/MBBI-MCDI/XI/2025
Task / Activity:
Continue Underwater inspection for make sure metal debris condition after dredging.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Natas
Standby Diver:
Imam
Tender 1:
Yakub
Tender 2:
Environmental Conditions
Weather:
Clear
Wind Speed:
0-5 Knots
Wave Height:
0.5 m
Current:
Moderate
Water Temp:
30 °C
Depth:
20 ft
Dive Timing
Left Surface:
10:32
Arrive Bottom:
10:33
Left Bottom:
11:28
Arrive Surface:
11:29
Bottom Time:
55 min
Total Time:
57 min
Summary
Job Result:
The diver successfully completed the cutting of metal section and The diver tied and secured the metal with a webbing belt.
Signed by:
Ahmad Maulana