Company Logo

DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:19 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:19/MBBI-MCDI/XI/2025
Dive No:19B/MBBI-MCDI/XI/2025
Task / Activity:Continue Underwater inspection and airlifting of soft seabed sediment.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Yakub
Standby Diver:Natas
Tender 1:Imam
Tender 2:
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.5 m
Current:Moderate
Water Temp:29 °C
Depth:20 ft
Dive Timing
Left Surface:14:20
Arrive Bottom:14:21
Left Bottom:15:45
Arrive Surface:15:46
Bottom Time:84 min
Total Time:86 min
Summary
Job Result:The diving operation utilizing the airlift system was unsuccessful due to rapid changes in the seabed contour. The section that had already been cleared was quickly re-buried as strong currents transported sand back into the excavated area.
Supervisor Signature

Signed by: Ahmad Maulana

Foto Dokumentasi