PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:17 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:17/MBBI-MCDI/XI/2025
Dive No:17A/MBBI-MCDI/XI/2025
Task / Activity:Underwater inspection and airlifting of soft seabed sediment.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Yakub
Standby Diver:Bambang
Tender 1:Imam
Tender 2:
Environmental Conditions
Weather:Clear
Wind Speed:0-5 Knots
Wave Height:0.7 m
Current:Moderate
Water Temp:30 °C
Depth:20 ft
Dive Timing
Left Surface:11:30
Arrive Bottom:11:31
Left Bottom:13:11
Arrive Surface:13:12
Bottom Time:100 min
Total Time:102 min
Summary
Job Result:The diver perform making hole on metal debris using broco cutting but cannot continue to airlift because the airlift hose detached underwater.