PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:17 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:17/MBBI-MCDI/XI/2025
Dive No:17B/MBBI-MCDI/XI/2025
Task / Activity:Continue Underwater inspection and airlifting of soft seabed sediment.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Bambang
Standby Diver:Imam
Tender 1:Yakub
Tender 2:
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.7 m
Current:Moderate to Strong
Water Temp:29 °C
Depth:20 ft
Dive Timing
Left Surface:14:38
Arrive Bottom:14:39
Left Bottom:16:03
Arrive Surface:16:04
Bottom Time:84 min
Total Time:86 min
Summary
Job Result:The work cannot continue and will resume tomorrow. Because any problem occurred on helmet experienced heavy sand ingress due to strong underwater current mixed with sand turbulence along the seabed.