DAILY DIVE LOG REPORT
PT. Uma Offshore Teknologi | Report Diving Operation
General Info
Date:
10 November 2025
Location:
SWI Jetty
Client:
PT. Mcconnel Dowel Indonesia
Job No:
10/MBBI-MCDI/XI/2025
Dive No:
10A/MBBI-MCDI/XI/2025
Task / Activity:
Lifting up metal debris feom seabed.
Personnel
Dive Supervisor:
Ahmad Maulana
Diver:
Maryanta
Standby Diver:
Yakub
Tender 1:
Bambang
Tender 2:
Imam
Environmental Conditions
Weather:
Clear
Wind Speed:
0-5 Knots
Wave Height:
0.7 m
Current:
Moderate
Water Temp:
29 °C
Depth:
20 ft
Dive Timing
Left Surface:
09:17
Arrive Bottom:
09:18
Left Bottom:
10:10
Arrive Surface:
10:11
Bottom Time:
52 min
Total Time:
54 min
Summary
Job Result:
Succes perform connect sling to metal debris for lifting up from seabed.
Signed by:
Ahmad Maulana