DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:10 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:10/MBBI-MCDI/XI/2025
Dive No:10A/MBBI-MCDI/XI/2025
Task / Activity:Lifting up metal debris feom seabed.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Maryanta
Standby Diver:Yakub
Tender 1:Bambang
Tender 2:Imam
Environmental Conditions
Weather:Clear
Wind Speed:0-5 Knots
Wave Height:0.7 m
Current:Moderate
Water Temp:29 °C
Depth:20 ft
Dive Timing
Left Surface:09:17
Arrive Bottom:09:18
Left Bottom:10:10
Arrive Surface:10:11
Bottom Time:52 min
Total Time:54 min
Summary
Job Result:Succes perform connect sling to metal debris for lifting up from seabed.
Supervisor Signature

Signed by: Ahmad Maulana