General Info
Date:10 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:10/MBBI-MCDI/XI/2025
Dive No:10A/MBBI-MCDI/XI/2025
Task / Activity:Underwater Ultrasonic Thickness Measurement on SWI Jetty Piles.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Yakub
Standby Diver:Bambang
Tender 1:Imam
Tender 2:Maryanta
Environmental Conditions
Weather:Clear
Wind Speed:0-5 Knots
Wave Height:0.7 m
Current:Moderate to Strong
Water Temp:30 °C
Depth:2 ft
Dive Timing
Left Surface:11:04
Arrive Bottom:11:05
Left Bottom:11:49
Arrive Surface:11:50
Bottom Time:44 min
Total Time:46 min
Summary
Job Result:Succesfully done to perform Underwater Ultrasonic Thickness Measurement on SWI Jetty Piles on 198, 186, 174, 162 - West & East.

Signed by: Ahmad Maulana