DAILY DIVE LOG REPORT

PT. Uma Offshore Teknologi | Report Diving Operation

General Info
Date:9 November 2025
Location:SWI Jetty
Client:PT. Mcconnel Dowel Indonesia
Job No:09/MBBI-MCDI/XI/2025
Dive No:09B/MBBI-MCDI/XI/2025
Task / Activity:Continue Underwater Ultrasonic Thickness Measurement on SWI Jetty Piles.
Personnel
Dive Supervisor:Ahmad Maulana
Diver:Maryanta
Standby Diver:Yakub
Tender 1:Bambang
Tender 2:Imam
Environmental Conditions
Weather:Cloudy
Wind Speed:0-5 Knots
Wave Height:0.9 m
Current:Moderate to Strong
Water Temp:30 °C
Depth:2 ft
Dive Timing
Left Surface:09:41
Arrive Bottom:09:42
Left Bottom:10:34
Arrive Surface:10:35
Bottom Time:52 min
Total Time:54 min
Summary
Job Result:Succesfully done to perform Underwater Ultrasonic Thickness Measurement on SWI Jetty Piles on 234, 222, 210 - West & East.
Supervisor Signature

Signed by: Ahmad Maulana